MIS-Aging Inspection | 11/19/2019 | 11/19/2019 | 11/19/2019 | | DONE |
Tell Riley
|
|
|
ESC ok per notes below
|
DOC - Permit Finaled | 11/19/2019 | 11/19/2019 | 11/19/2019 | P | PASS |
Tell Riley
|
|
|
|
MIS-Aging Inspection | 8/16/2019 | 8/16/2019 | 8/16/2019 | | PASS |
Tell Riley
|
|
|
Taken care of by ESC inspector//
|
ESC-Conference | 10/19/2018 | 10/23/2018 | 10/24/2018 | A | PASS |
Andy J. Long
|
|
|
follow up on sweeping and clean up
Road was swept. No further requests at this time.
|
ESC-Final | 10/15/2018 | 10/17/2018 | 10/19/2018 | P | FAIL |
Andy J. Long
|
|
|
follow up
Stockpile cleaned and site is closed off. Still lots of loose dirt on road. Not clear that any sweeping was done. Trackout clumps all the way around corner.
Correction to get street sweeper scheduled. Talked to Phil with Bulldog, says sweeping is scheduled for Monday PM. I requested that after sweeping a crew return to site and get what sweeper could not. Follow up Tuesday
|
ESC-Conference | 10/12/2018 | 10/15/2018 | 10/15/2018 | P | PEND |
Andy J. Long
|
|
|
Some clean up of loose dirt and material was completed.
Homeowner/developer Chris stated that Bulldog Excavation will return to site tomorrow to finish clean up and finish remaining earth work. Lot is to be a new SFH by Doug Lasher and will have ESC permit issued with BLD.
|
ESC-Conference | 10/12/2018 | 10/12/2018 | 10/12/2018 | P | FAIL |
Andy J. Long
|
|
|
Complaint received.
Excessive trackout with no clean up. Request to homeowner and excavator Bulldog Excavation to clean up ASAP. This is reportedly to be completed tomorrow. Follow up scheduled for Monday.
This project will now require a general ESC permit.
|