MIS-Aging Inspection | 6/23/2020 | 6/23/2020 | 6/30/2020 | | DONE |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 6/30/2020 | 6/30/2020 | 6/30/2020 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Conference | 6/18/2019 | 6/18/2019 | 6/18/2019 | A | DONE |
Bob Archibald
|
|
|
Engineering report on settlement
|
PLM-Conference | 6/17/2019 | 6/17/2019 | 6/17/2019 | P | PASS |
Daryl Spivey
|
|
|
Verify if water is leaking into the sewer ejector vault. The system is functioning on one pump. Ground water leaking into ejector tank. Manager given a NOV and 30 days to get a permit and start work on repairing or replacing ejector tank and pumps...........ds
|
PLM-Conference | 5/31/2019 | 5/31/2019 | 5/31/2019 | P | PASS |
Daryl Spivey
|
|
|
installed a temp pump for sewage in outside ejector until new pumps are installed....no issues.......repair work only...............ds
|
BLD-Conference | 5/31/2019 | 5/31/2019 | 5/31/2019 | P | PASS |
Bob Archibald
|
|
|
Conference with maintenance manager . Settling of foundation was reviewed by structural engineer 3 years ago and again last year. No additional movement observed. Waiting on copy of report.
|