PLM-Conference | 9/3/2019 | 9/4/2019 | 9/4/2019 | A | FAIL |
Eric Strole
|
|
|
call ahead // plumbing done incorrectly // Jayme Phone #: ###-####=Left correction notice. Plumbing work was done with out a permit. A plumbing permit is required. Need to vent toilet. Need to vent wash basin. Shower requires a 2" p-trap. All new fixtures that where installed require to be permited. All plumbing for new bath needs to be plumbed per the 2017 ISPC.
|