BLD-Conference | 4/24/2020 | 5/8/2020 | 5/8/2020 | A | DONE |
Tell Riley
|
|
|
follow up//discussed with supervisor that no building permit has been issued//sent email with photos and MIS information//
|
BLD-Conference | 3/20/2020 | 4/24/2020 | 4/24/2020 | A | DONE |
Tell Riley
|
|
|
followup on 25 day notice...//no permits have been issued for building// correction notice issued outlining notice of violation, ten days will check back//
|
BLD-Conference | 3/13/2020 | 3/20/2020 | 3/20/2020 | P | DONE |
Tell Riley
|
|
|
follow up after 5 day notice of violation//25 day notice issued//a window permit was recieved but is not in issued status//still needs to get permit for interior remodel//pictures taken of notice posted, as contractor was not onsite when issued//
|
BLD-Conference | 3/5/2020 | 3/12/2020 | 3/13/2020 | A | DONE |
Tell Riley
|
|
|
follow up after 5days taling with contractor...see previous notes....NOTICE OF VIOLATION issued//5 day notice//contractor not onsite--photo taken of posting//follow up 5 days//
|
BLD-Conference | 2/28/2020 | 3/5/2020 | 3/5/2020 | A | DONE |
Tell Riley
|
|
|
follow up....//talked with contractor and advised to make application within 5 days or a Notice of Violation will be issued//new walls installed inside home new kitchen payout, windows, sideing// check back 5 days//
|
MEC-Conference | 2/27/2020 | 3/5/2020 | 3/5/2020 | A | DONE |
Brian Scoles
|
|
|
check on permit- permit has been issued ubder different parcel for this address- this address has 2 parcels
|
MEC-Conference | 3/3/2020 | 3/3/2020 | 3/3/2020 | P | PASS |
Brian Scoles
|
|
|
Mechanical permit has been issued- there are 2 parcel at this address and mec20-00818 is pulled for mech work at 12248 Goldenrod- mis20-00051 has different partial than mech permit
|
BLD-Conference | 2/21/2020 | 2/28/2020 | 2/28/2020 | A | FAIL |
Tell Riley
|
|
|
follow up..check for permits...//plumbing permit open//still waiting for other permits......//check back 5 days//
|
MEC-Conference | 2/21/2020 | 2/27/2020 | 2/27/2020 | A | FAIL |
Brian Scoles
|
|
|
check on mech permit for mech work- no permit issued yet- bld inspector been in contact with general contractor
|
ELE-Conference | 2/18/2020 | 2/24/2020 | 2/24/2020 | A | DONE |
Mark Moncarr
|
|
|
check for permits Permit was pulled. ELE20-00615 B&B elec.
|
BLD-Conference | 2/14/2020 | 2/21/2020 | 2/21/2020 | A | DONE |
Tell Riley
|
|
|
follow up....//all trades have posted notices//cotractor made contact with me yesterday--advised him to contact plan review to start process for permits//appears to be a plumbing permit issued//check back 5 days//
|
MEC-Conference | 2/21/2020 | 2/21/2020 | 2/21/2020 | P | FAIL |
Brian Scoles
|
|
|
need permit issued for mech work on exhaust fans (2) and any other work associated with mechanical- will need R/I inspection and able to see work before cover- left notice front window
|
ELE-Conference | 2/14/2020 | 2/18/2020 | 2/18/2020 | A | PASS |
Tom Saunders
|
|
|
correction notice posted...5 days given to start process..future inspection scheduled
|
PLM-Conference | 2/14/2020 | 2/18/2020 | 2/18/2020 | A | PART |
Matt Wrobel
|
|
|
no one on site left notice to pull permits obvious interior remodel in progress
|
BLD-Conference | 2/14/2020 | 2/14/2020 | 2/14/2020 | P | DONE |
Tell Riley
|
|
|
exterior work being done//appears to be new windows and roofing//possible interior work as well based on demo material in truck onsite//check back 5 days//
|