ELE-Conference | 6/30/2020 | 7/24/2020 | 7/24/2020 | A | DONE |
Tom Saunders
|
|
|
check for permit...verify occupency of building... due to COVID19 no occupency in building
|
ELE-Conference | 5/28/2020 | 6/30/2020 | 6/30/2020 | A | DONE |
Tom Saunders
|
|
|
check for permit...giving time do to COVID19 and building not occupied...building still not occupied
|
ELE-Conference | 4/30/2020 | 5/29/2020 | 5/28/2020 | A | PASS |
Tom Saunders
|
|
|
check for permits and code violations addressed...contact has been made from tenant..company out of Texas...giving time do to COVID19 andnot occupying space
|
ELE-Conference | 4/24/2020 | 5/1/2020 | 4/30/2020 | A | PASS |
Tom Saunders
|
|
|
check for permit...give 30 day if none... business representative made contact and working on hiring contractor...future inspection scheduled 5/29/20
|
ELE-Conference | 4/24/2020 | 4/24/2020 | 4/24/2020 | P | PASS |
Tom Saunders
|
|
|
no electrical permits...correction notice posted...5 days given
|