BLD-Conference | 4/28/2020 | 4/28/2020 | 4/28/2020 | P | CANC |
Brandon Shaw
|
|
|
Working without permits. Need to start permit process with P&Z and building. Stop Work Order posted...
|
BLD-Conference | 4/24/2020 | 4/27/2020 | 4/27/2020 | A | DONE |
Bob Archibald
|
|
|
Confrence with electrical and ESC on proposed use. Parcel owner must begin permit process with P&Z and obtain building and trade permits. SWO has been issued
|
ELE-Conference | 4/24/2020 | 4/27/2020 | 4/27/2020 | A | DONE |
Eric Story
|
|
|
Need p@z and building permits in order to ove forward
|
ELE-Conference | 4/24/2020 | 4/24/2020 | 4/24/2020 | P | FAIL |
Rock A. Hudson
|
|
|
Responded to a request for permanent service inspection. Performed permit search which produced no additional information on permits of planning and zoning approvals. Called Andy Long to see if an ESC permit is required. He emailed Bob Archibald and Cody Riddle who both responded with planning and zoning approval and building permits are required. Posted stop work order.
|