BLD-Conference | 5/26/2020 | 6/1/2020 | 6/1/2020 | A | DONE |
Tell Riley
|
|
|
follow up
|
DOC - Permit Finaled | 6/1/2020 | 6/1/2020 | 6/1/2020 | P | PASS |
Tell Riley
|
|
|
occupant has made application for permit and is under review//
|
BLD-Conference | 5/12/2020 | 5/26/2020 | 5/26/2020 | A | DONE |
Tell Riley
|
|
|
follow up...//met with owner, she is working with plan review for a permit, was waiting for CDHD approval for submittal//will check back 5 days//
|
BLD-Conference | 5/5/2020 | 5/8/2020 | 5/12/2020 | A | DONE |
Tell Riley
|
|
|
2nd follow up//talked with worker, said owner is working on permits, and may have already submitted for review//check back 10 days//
|
BLD-Conference | 4/28/2020 | 5/5/2020 | 5/5/2020 | A | DONE |
Tell Riley
|
|
|
follow up on occupancy permit//still no permit issued for occupancy, this is a 5 day followup, will check back end of week, and issue 2nd correction if no permit has been issued//
|
BLD-Conference | 4/28/2020 | 4/28/2020 | 4/28/2020 | P | DONE |
Tell Riley
|
|
|
operating without an occupancy permit // Dinko (CDHD) Phone #: ###-####//left CN with employee, asked to forward to owner//need to obtain occupany permit and inspections//will check back 5 days//
|