BLD-Conference | 5/7/2020 | 5/14/2020 | 5/14/2020 | A | DONE |
Tell Riley
|
|
|
follow up on permits
|
DOC - Permit Finaled | 5/14/2020 | 5/14/2020 | 5/14/2020 | P | PASS |
Tell Riley
|
|
|
permit was issued for re-roof//
|
BLD-Conference | 5/6/2020 | 5/7/2020 | 5/7/2020 | A | DONE |
Tell Riley
|
|
|
Per Brian Mec. Inspect. Reroof without permits Phone #: ###-####//new roof being installed//photos taken, correction notice posted on garage door// follow up in 5 days//
|