INSP-Final | 4/22/2015 | 4/23/2015 | 4/23/2015 | A | PASS |
Troy Cobbley
|
|
|
permit finaled by Ron with boise fire
|
INSP-Final | 4/7/2015 | 4/8/2015 | 4/8/2015 | A | FAIL |
Forrest France
|
|
|
Correction items include NAC trouble on circuit two, non-functional a/v on the third floor. Approved plans do not show ADA unit visual appliances. Riser monitoring tested ok. Per Forrest France.
|
INSP-Final | 4/7/2015 | 4/7/2015 | 4/7/2015 | A | CANC |
Troy Cobbley
|
|
|
>> Inspection requested via mobile web by Jonathan Inspection cancelled via mobile web on Tuesday, April 07, 2015.
|
INSP-Final | 4/6/2015 | 4/6/2015 | 4/6/2015 | P | CANC |
Forrest France
|
|
|
Phone #: ###-#### >> Inspection requested via web by Matt Casey Inspection cancelled from web by: Matt Casey
|
INSP-Final | 3/26/2015 | 3/27/2015 | 3/27/2015 | A | CANC |
Troy Cobbley
|
|
|
Sprinkler inspection have already been scheduled and confirmed for 9am with JBL Fire Phone #: ###-#### >> Inspection requested via web by Matt Casey Inspection cancelled from web by: Matt Casey
|