[Telaya Wine Co.]
The fire sprinkler scope of work consists of protecting a new building with a grid type system. A new 6”x173’± C-900 underground pipe will brought into a 1 hour rated room with outside entrance. A sign shall be provided on the riser room door. A new 6” riser will be supplied through a 6” backflow preventer. The FDC will connect to the secondary main to exit the building near the fire department entrance to the property, as annotated on the plans.

(Telaya Winery) For the construction of a new 11,138 sq. ft. two story (8,713 first, 2,425 second) winery with associated offices and tasting room areas with work to include construction of the new building including all interior improvements and related site work. The first story consists of two tasting rooms, an office, restrooms and a production area. The second story has two offices and a small club room/tasting area. There are two mezzanines in the production area (315 sq. ft. and 800 sq. ft.). This building is fully fire sprinklered. CDM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final1/15/20161/15/20161/15/2016PPASS
DetailsKatie Marron
Last correction items completed. Scope of work complete. Permit finaled.
INSP-Final1/12/20161/13/20161/13/2016PPART
DetailsKatie Marron
Systems test completed satisfactory.

Final items to be completed. Eschuteons on heads in corridor currently being painted and sticker on outside alarm bell.
INSP-Sprinkler Rough-in/Hydro1/13/20161/13/20161/13/2016APASS
DetailsKatie Marron
Hydrostatic retest completed satisfactory.
INSP-Sprinkler Rough-in/Hydro1/11/20161/12/20161/12/2016PPART
DetailsKatie Marron
Rough in fully complete. All perviously noted items completed satifactory.

Hydro Failed. Pressure dropped by 1-2 psi. Walked and found drip by upright sprinkler head in production bay. Hydro to be redone tomorrow in conjunction with final.
INSP-Sprinkler Rough-in1/6/20161/7/20161/7/2016APASS
DetailsKatie Marron
Roughin complete. All hard lid areas OK to cover. Verified west stairwell and under stair areas.

Still to be completed, grid ceiling pendants (drops in place), uprights under cedar ceiling and dry sidewalls.
INSP-Sprinkler Rough-in12/29/201512/30/201512/30/2015APASS
DetailsKatie Marron
Rough in completed satisfactory. Hard lids ok to cover except west stairwell. Pendants in grid ceiling and dry side walls still to be installed, see approved plans for circled heads. Mains/branchilnes were in place just missing drops and heads.
INSP-Supply line flush11/2/201511/2/201511/2/2015PPASS
DetailsKatie Marron
Supply line flush completed satisfactorily.
INSP-Sprinkler Rough-in/Hydro7/29/20157/30/20157/30/2015APASS
DetailsJim Page
Underground hydrostatic test passed/complete
INSP-Sprinkler Rough-in7/1/20157/7/20157/7/2015APART
DetailsKatie Marron
Underground 6" sprinkler supply pipe ok to cover.