INSP-Final | 6/13/2016 | 6/14/2016 | 6/14/2016 | A | PASS |
Katie Marron
|
|
|
Hydrostatic test completed/passed. Systems acceptance test completed satisfactory. Scope of work complete. Permit Finaled.
|
INSP-Sprinkler Rough-in/Hydro | 2/2/2016 | 2/3/2016 | 2/2/2016 | A | CANC |
Katie Marron
|
|
|
Duplicate inspection request.
|
INSP-Sprinkler Rough-in | 2/2/2016 | 2/3/2016 | 2/2/2016 | A | PASS |
Katie Marron
|
|
|
Reinspection. Piping on main level was reinstalled. Main now runs true to plans. No tenting inspection required, sprayed in foam is being utilized. Roughin completed "ok".
|
INSP-Sprinkler Rough-in | 1/27/2016 | 1/28/2016 | 1/29/2016 | A | PEND |
Katie Marron
|
|
|
Rough-in inspection completed. Resubmittals required for main level piping changes. Pending submittal approval rough-in pass.
Note: head under stairs missing, it will be installed directly off riser and clearly visible at time of final.
|