INSP-Final | 5/26/2016 | 5/27/2016 | 5/27/2016 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 5/24/2016 | 5/25/2016 | 5/25/2016 | P | PART |
Troy Cobbley
|
|
|
A temporary on this permit only until wireless dialer has been addressed. Also the data sheet for the facp does not match the install. All devices tested through the temp. phone lines.
|
INSP-Final | 5/18/2016 | 5/19/2016 | 5/19/2016 | A | CANC |
Troy Cobbley
|
|
|
Not ready for a final yet due to another contractor installing a wireless dialer
|
INSP-Final | 5/18/2016 | 5/19/2016 | 5/18/2016 | P | CANC |
Troy Cobbley
|
|
|
Primary Health Garden City Afternoon if possible Please contact Ken Webster Phone #: ###-#### >> Inspection requested via web by Ken Webster Inspection cancelled from web by: Ken Webster
|