INSP-Final | 8/22/2017 | 8/22/2017 | 8/22/2017 | A | PASS |
Troy Cobbley
|
|
|
Rough in and flush and hydro were all complete there was never a final called in Phone #: ###-#### >> Inspection requested via web by Sam Ball
|
DOC - Permit Finaled | | | 8/22/2017 | | |
Troy Cobbley
|
|
|
|
INSP-Supply line flush | 4/25/2016 | 4/26/2016 | 4/26/2016 | A | PASS |
Katie Marron
|
|
|
Underground flush completed satisfactorily.
|
INSP-Final | 4/26/2016 | | 4/26/2016 | P | PASS |
Scott Arellano
|
|
|
|
INSP-Sprinkler Rough-in/Hydro | 4/21/2016 | 4/22/2016 | 4/22/2016 | A | PASS |
Katie Marron
|
|
|
Underground hydro completed satisfactorily.
|
INSP-Sprinkler Rough-in | 3/29/2016 | 3/30/2016 | 3/30/2016 | P | PASS |
Katie Marron
|
|
|
Underground pipe ok to cover. Depth and thrust blocks completed satisfactory.
|