INSP-Sprinkler Rough-in | 7/27/2017 | 7/28/2017 | 7/28/2017 | P | CANC |
Jim Page
|
|
|
Inspection request was for main entry canopy, this inspection request is cancelled
|
DOC - Permit Finaled | | | 5/2/2017 | | DONE |
|
|
|
underground finaled 5/2/17 overhead under separate permit
|
INSP-Sprinkler Rough-in/Hydro | 5/1/2017 | 5/1/2017 | 5/1/2017 | P | PASS |
Jim Page
|
|
|
Underground hydro complete
|
INSP-Supply line flush | 5/1/2017 | 5/1/2017 | 5/1/2017 | P | DONE |
Jim Page
|
|
|
Supply line flush complete
|