INSP-Final | 11/8/2018 | 11/8/2018 | 11/8/2018 | P | DONE |
Troy Cobbley
|
|
|
permit finaled
|
DOC - Permit Finaled | | | 11/8/2018 | | DONE |
|
|
|
Per passing inspection 11/8/18
|
INSP-Supply line flush | 11/2/2018 | 11/6/2018 | 11/6/2018 | A | PASS |
Troy Cobbley
|
|
|
The underground supply piping flush passsed
|
INSP-Sprinkler Rough-in/Hydro | 4/30/2018 | 5/1/2018 | 5/1/2018 | A | PASS |
Troy Cobbley
|
|
|
The underground supply piping hydro test passed.
UG Hydro Please coordinate with Troy nelson Phone #: ###-#### Inspection requested via web by Christophe Wilson
|
INSP-Sprinkler Rough-in | 4/9/2018 | 4/10/2018 | 4/10/2018 | A | PASS |
Jim Page
|
|
|
Rough to cover inspection for underground supply complete, approved for cover.
|