INSP-Final | 7/26/2019 | 7/29/2019 | 7/29/2019 | A | DONE |
Troy Cobbley
|
|
|
Permit finaled
>> Inspection requested via mobile web by Tyler
|
DOC - Permit Finaled | | | 7/29/2019 | | DONE |
|
|
|
Per Troy C and Passing final inspection
|
INSP-Final | 7/25/2019 | 7/26/2019 | 7/26/2019 | A | CANC |
Troy Cobbley
|
|
|
Call prior to going Phone #: 2082979090 >> Inspection requested via mobile web by Ken Inspection cancelled via mobile web on Friday, July 26, 2019.
|
INSP-Sprinkler Rough-in/Hydro | 7/24/2019 | 7/25/2019 | 7/25/2019 | A | PASS |
Troy Cobbley
|
|
|
The hydro tests for both overhead wet systems witnessed with no pressure loss. Call prior to going Phone #: 2088801974 >> Inspection requested via mobile web by Tyler
|
INSP-Sprinkler Rough-in/Hydro | 7/23/2019 | 7/24/2019 | 7/24/2019 | A | PART |
Troy Cobbley
|
|
|
The overhead 200lb hydro failed for both wet systems due to visible loss on the guages but the dry system passed with no visible loss at the guage.
Call prior to going Phone #: 2088105425 >> Inspection requested via mobile web by Tyler
|
INSP-Sprinkler Rough-in/Hydro | 7/22/2019 | 7/23/2019 | 7/23/2019 | A | PASS |
Troy Cobbley
|
|
|
Underground supply line hydro test witnessed.
Call prior to going Phone #: 2088105425 >> Inspection requested via mobile web by Tyler Bradley
|
INSP-Sprinkler Rough-in/Hydro | 7/18/2019 | 7/19/2019 | 7/19/2019 | A | PASS |
Troy Cobbley
|
|
|
24 hour air test passed for the dry system
Call prior to going Phone #: 2082979090 >> Inspection requested via mobile web by Ken
|
INSP-Sprinkler Rough-in/Hydro | 7/17/2019 | 7/18/2019 | 7/18/2019 | P | PART |
Troy Cobbley
|
|
|
24 hour air test for dry system started at 11:30 with 42.5psi on the guage.
Call prior to going Phone #: 2082979090 >> Inspection requested via mobile web by Ken
|
INSP-Conference | 7/17/2019 | 7/18/2019 | 7/18/2019 | A | DONE |
Troy Cobbley
|
|
|
Todd and I went over general life safety requirements.
Todd- Phone #: ###-####
|
INSP-Sprinkler Rough-in | 6/11/2019 | 6/12/2019 | 6/12/2019 | P | PART |
Jim Page
|
|
|
Inspection for overhead fire sprinkler piping above hardlids on level 1 breezeway and level 1 parking on the northwest complete, areas inspected approved for cover.
side of Call prior to going Phone #: 2082979090 >> Inspection requested via mobile web by Ken
|
INSP-Sprinkler Rough-in | 5/22/2019 | 5/22/2019 | 5/22/2019 | P | PART |
Troy Cobbley
|
|
|
The remaining piping in the third floor corridor is ok for cover. The rough-in for the Retail area is passed. It appears tha plan mods will be required for the changes in the Breeze Way and the Cover Parking area. These areas are having concealed space uprights being added and the pendants are on flex-heads.These areas can not be covered until approved by plan review and an inspection.
Call prior to going Phone #: 2082979090 >> Inspection requested via mobile web by Ken
|
INSP-Sprinkler Rough-in | 5/16/2019 | 5/16/2019 | 5/16/2019 | P | PASS |
Troy Cobbley
|
|
|
The remaing piping in the 2nd floor corridor is ok for cover. The remaining Resident rooms on the 3rd floor are ok for cover.
Call prior to going Phone #: 2082972020 >> Inspection requested via mobile web by Ken
|
INSP-Sprinkler Rough-in/Hydro | 5/16/2019 | 5/16/2019 | 5/16/2019 | P | CANC |
Troy Cobbley
|
|
|
Phone #: 2082979090 >> Inspection requested via mobile web by Teri Cruikshank
|
INSP-Conference | 5/13/2019 | 5/13/2019 | 5/13/2019 | P | DONE |
Troy Cobbley
|
|
|
I performed a walk through of the Resident Areas of the first floor and it looks like sprinkler work is complete except for the waterheater closet in the corridor which has no ceiling. I did not look in the Riser Room. I performed the same walk through of the second floor for the Resident Rooms between column lines 11 and 6 and work appears complete. None of the balconies are complete yet. Call prior to going Phone #: 2082979090 >> Inspection requested via mobile web by Ken
|
INSP-Sprinkler Rough-in | 5/6/2019 | 5/6/2019 | 5/6/2019 | P | PASS |
Troy Cobbley
|
|
|
Verified E.Q. bracing at first floor riser and giving ok to cover for east end of the third floor corridor.
Call prior to going Phone #: 2082979090 >> Inspection requested via mobile web by Ken
|
INSP-Sprinkler Rough-in | 4/17/2019 | 4/17/2019 | 4/17/2019 | P | PART |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping above lowered ceilings complete, notated packet in job shack with red ink areas approved for cover, inspected rooms 201, 203, 204, 205, 206, 207 and 208.
Call prior to going Phone #: 2082979090 >> Inspection requested via mobile web by Ken
|
INSP-Sprinkler Rough-in | 4/8/2019 | 4/9/2019 | 4/9/2019 | P | PASS |
Troy Cobbley
|
|
|
The piping above the soffits in the Community Room and Closet, on the first floor, is ok for cover.
Call prior to going Phone #: 2082979090 >> Inspection requested via mobile web by Ken
|
INSP-Sprinkler Rough-in/Hydro | 4/3/2019 | 4/5/2019 | 4/5/2019 | A | PART |
Jim Page
|
|
|
Rough to cover ispection for overhead fire sprinkler above level 3 west stairwell complete, level 3 west stairwell approved for cover.
Call prior to going Phone #: 2082979090 >> Inspection requested via mobile web by Ken
|
INSP-Sprinkler Rough-in | 4/2/2019 | 4/3/2019 | 4/3/2019 | A | PASS |
Troy Cobbley
|
|
|
Dry system rough-in passed. Need seismic restraints at the ends of the branchlines as discussed. Sheet rock is ok to be installed above the piping for the rated envelope.
Call prior to going Phone #: 2082979090 >> Inspection requested via mobile web by Ken
|
INSP-Sprinkler Rough-in/Hydro | 4/2/2019 | 4/3/2019 | 4/3/2019 | A | FAIL |
Troy Cobbley
|
|
|
24 hour air test failed due to visible leak at the dry pipe valve.
Call prior to going Phone #: 2082979090 >> Inspection requested via mobile web by Ken
|
INSP-Sprinkler Rough-in/Hydro | 4/1/2019 | 4/1/2019 | 4/1/2019 | P | PASS |
Troy Cobbley
|
|
|
The piping above the hardlids, on the second floor, from column line 6 to 11 is ok for cover. Call prior to going Phone #: 2082979090 >> Inspection requested via mobile web by Ken
|
INSP-Sprinkler Rough-in | 3/28/2019 | 3/29/2019 | 3/29/2019 | P | PASS |
Troy Cobbley
|
|
|
The large apartment on the very east end of the third floor is ok for soffit cover.
Call prior to going Phone #: 2082979090 >> Inspection requested via mobile web by Ken
|
INSP-Sprinkler Rough-in | 3/26/2019 | 3/27/2019 | 3/27/2019 | A | CANC |
Troy Cobbley
|
|
|
Call prior to going Phone #: 2082979090 >> Inspection requested via mobile web by Ken
|
INSP-Sprinkler Rough-in | 3/25/2019 | 3/25/2019 | 3/25/2019 | P | PASS |
Troy Cobbley
|
|
|
The sprinkler piping above the soffits in the redident rooms on the third floor east end are ok for cover. This includes four rooms on the south side and four on the north side as marked on the general contractors record prints.
|
INSP-Sprinkler Rough-in | 3/21/2019 | 3/22/2019 | 3/22/2019 | A | PASS |
Troy Cobbley
|
|
|
The first floor closet/room next to the east stairs is ok for cover.
Call prior to going Phone #: 2082979090 >> Inspection requested via mobile web by Ken
|
INSP-Sprinkler Rough-in | 3/11/2019 | 3/12/2019 | 3/12/2019 | P | PASS |
Troy Cobbley
|
|
|
Insulation has been added to the third floor east stairwell combustible concealed space. Piping can be covered.
Call prior to going Phone #: 2082979090 >> Inspection requested via mobile web by Ken
|
INSP-Sprinkler Rough-in | 3/11/2019 | 3/11/2019 | 3/11/2019 | P | PASS |
Troy Cobbley
|
|
|
The last resident room on the third floor northwest corner of the building is ok for cover with the additional upright. The short north/south corridor on the west end of the building is also ok to cover with the addition of three new upright heads. These new heads will need to be shown on the as-builts.
Call prior to going Phone #: 2082979090 >> Inspection requested via mobile web by Ken
|
INSP-Sprinkler Rough-in | 3/7/2019 | 3/8/2019 | 3/8/2019 | A | PASS |
Troy Cobbley
|
|
|
The remaining third floor resident rooms are ok for cover at the deck except for the very end/northwest apartment that needs upright protection modified due to shearing that has been installed. I also noted missing upright protection in the northwest corridor and at the top of both stairs. Also both mechanical shafts, as per previous conversations, will need to be totally sheetrocked. I also noted that at the first floor east stairwell there is a exposed wood beam that is still exposed. Call prior to going Phone #: 2082979090 >> Inspection requested via mobile web by Ken
|
INSP-Sprinkler Rough-in | 3/6/2019 | 3/7/2019 | 3/7/2019 | A | PASS |
Troy Cobbley
|
|
|
Rough-in passed for the third floor rooms to almost column line 3. See the general contractors record drawings for specific rooms.
Call prior to going Phone #: 2082979090 >> Inspection requested via mobile web by Ken
|
INSP-Sprinkler Rough-in | 2/28/2019 | 3/4/2019 | 3/4/2019 | A | PASS |
Troy Cobbley
|
|
|
The piping above the room soffits between column line 6 and 11 is ok for cover. I spoke to Ken and the general contractor about possible obstructions due to light fixtures. Call prior to going Phone #: 2082979090 >> Inspection requested via mobile web by Jeff
|
INSP-Sprinkler Rough-in | 2/26/2019 | 2/27/2019 | 2/27/2019 | A | PASS |
Troy Cobbley
|
|
|
First floor corridor piping east of column line 6 is ok for cover. One additional pendant may be required at the east stairwell/corridor alcove due to the corridor pendant head half spacing being exceeded. Call prior to going Phone #: 2082979090 >> Inspection requested via mobile web by Ken
|
INSP-Sprinkler Rough-in | 2/19/2019 | 2/19/2019 | 2/19/2019 | P | PASS |
Troy Cobbley
|
|
|
Rough-in passed for the remaining sprinkler piping on the second floor. Piping can be covered from column line 6 to the west end of the building including the balconies. One lateral brace needs to be added on the 4" main as shown on the approved plans.
Call prior to going Phone #: 2082979090 >> Inspection requested via mobile web by Ken
|
INSP-Supply line flush | 2/13/2019 | 2/15/2019 | 2/15/2019 | A | DONE |
Jim Page
|
|
|
Underground main line flush complete.
Call prior to going Phone #: 2082799090 >> Inspection requested via mobile web by Ken
|
INSP-Sprinkler Rough-in | 2/11/2019 | 2/12/2019 | 2/12/2019 | A | PASS |
Troy Cobbley
|
|
|
The piping can be covered in the East Stair walls, first and second floors, and in the first floor rooms as marked at the bottom of the East Stairs. Also piping rough-in for the Riser Room and the adjoining Electrical Room is passed.
Call prior to going Phone #: 2082979090 >> Inspection requested via mobile web by Ken
|
INSP-Sprinkler Rough-in | 2/7/2019 | 2/8/2019 | 2/8/2019 | A | PASS |
Troy Cobbley
|
|
|
The third floor baconies can be covered up to column line 6 and the 4" supply piping in the second floor wall can be covered.
Call prior to going Phone #: 2082979090 >> Inspection requested via mobile web by Ken
|
INSP-Sprinkler Rough-in | 2/6/2019 | 2/7/2019 | 2/7/2019 | P | PASS |
Troy Cobbley
|
|
|
The sprinkler piping above/in the soffits is ok for cover on the first floor residential rooms.
Call prior to going Phone #: 2082799090 >> Inspection requested via mobile web by Ken Orahood
|
INSP-Sprinkler Rough-in | 2/5/2019 | 2/6/2019 | 2/6/2019 | A | PASS |
Troy Cobbley
|
|
|
The third floor residential rooms, as marked on the general contractors record drawing, are ok to cover except along the exterior walls as discussed. The dry sidewalls for the combustilbe concealed space over the balconies have been installed but the dry flex heads have not been installed yet.
Call prior to going Phone #: 2082979090 >> Inspection requested via mobile web by Ken
|
INSP-Sprinkler Rough-in | 2/4/2019 | 2/5/2019 | 2/5/2019 | A | PASS |
Troy Cobbley
|
|
|
The dry pendants have been installed in the second floor baconies up to column line 6 and the piping can be covered. Third floor piping inspected today needs some additional hangers. Inspection will be called back in for third floor for tomorrow.
Call prior to going Phone #: 2082979090 >> Inspection requested via mobile web by Ken Orahood
|
INSP-Sprinkler Rough-in/Hydro | 2/4/2019 | 2/5/2019 | 2/4/2019 | A | CANC |
Troy Cobbley
|
|
|
Phone #: 2082979090 >> Inspection requested via mobile web by Ken Orahood Inspection cancelled via mobile web on Monday, February 04, 2019.
|
INSP-Sprinkler Rough-in | 1/30/2019 | 1/31/2019 | 1/31/2019 | P | PART |
Troy Cobbley
|
|
|
Inspection was to include the thrid floor but I noted that the concealed space heads are overspaced. Inspection was stopped for the third floor. However sprinkler protection has been added back in the first floor balconies so the interior piping can be covered now on the first floor of the residential (east end) area.
Call prior to going Phone #: 2082979090 >> Inspection requested via mobile web by Ken
|
INSP-Sprinkler Rough-in | 1/17/2019 | 1/18/2019 | 1/18/2019 | A | PASS |
Troy Cobbley
|
|
|
First floor community room sprinkler piping is ok for cover, first floor 4" main resident earthquake bracing in the Residential corridor is passed, the east end second floor Resident rooms as marked on the plans are ok for cover except for the area where the patio sprinkler will be required to be connected. One pendnat needs to be added in a furnace room
Call prior to going Phone #: 2082979090 >> Inspection requested via mobile web by Ken
|
INSP-Sprinkler Rough-in | 1/15/2019 | 1/15/2019 | 1/15/2019 | P | PASS |
Troy Cobbley
|
|
|
Todays inspection was to verify the earthquake bracing in Room 108. Work is complete.
Call prior to going Phone #: 2082979090 >> Inspection requested via mobile web by Ken
|
INSP-Sprinkler Rough-in | 1/7/2019 | 1/9/2019 | 1/9/2019 | A | PART |
Troy Cobbley
|
|
|
Today was a re-inspection of the first floor Residential rooms on the south side of the corridor and a new inspection for the Residential rooms on the north side of the corridor. The apartments have the sprinklers deleted/relocated as per the contractors discussion with plan review. As-builts do not match installation as per my previous request (additional 90's are not shown). Also the sprinkler contractor has deleted the sprinkler coverage under the balconies on the as-built plans that are provided. This has not been approved. I spoke to Raddix, the builder, and to the Boise City plan reviewer and neither one has approved this. I gave the ok to cover but ceilings will be removed if sprinklers need to be installed. The baconies construction needs to meet NFPA 13, and be approved, or sprinkler protection needs to be provided as shown on the city approved plans. Also no additional cover inspections will be approved if the provided as-builts do not match the installation as previously requested.
Call prior to going Phone #: 2082979090 >> Inspection requested via mobile web by Ken. Rough to Cover
|
INSP-Conference | 1/4/2019 | 1/7/2019 | 1/7/2019 | P | DONE |
Troy Cobbley
|
|
|
The wrong inspection number was called in Friday but I spoke to Ken about his concerns. Phoenix Fire would like to delete one of the two pendant heads in the rooms where the ceiling fans are now being deleted. I deferred him back to plan review on whether this would be an as-built or a plan modification due to possibly changing the third floor calculation area. Also I stated that any piping changes such as the additional 90's in the piping in the firxt floor southwest area I just inspected would need to be shown.
Call prior to going Phone #: 2082979090 >> Inspection requested via mobile web by Ken
|
INSP-Sprinkler Rough-in | 12/31/2018 | 1/2/2019 | 1/2/2019 | P | PART |
Troy Cobbley
|
|
|
See the city approved plans for the four rooms on the first floor, southeast corner, where piping is ok for cover.
Call prior to going Phone #: 2082979090 >> Inspection requested via mobile web by Ken
|
INSP-Sprinkler Rough-in/Hydro | 12/31/2018 | 1/2/2019 | 12/31/2018 | A | CANC |
Troy Cobbley
|
|
|
Phone #: 2082979090 >> Inspection requested via mobile web by Ken Inspection cancelled via mobile web on Monday, December 31, 2018.
|