INSP-Final | 10/8/2019 | 10/8/2019 | 10/8/2019 | P | DONE |
Troy Cobbley
|
|
|
Permit finaled. Phone #: ###-#### Inspection requested via web by Sam Ball
|
DOC - Permit Finaled | | | 10/8/2019 | | DONE |
|
|
|
Per Troy C, 10/8/19 Final inspection
|
INSP-Final | 9/18/2019 | 9/19/2019 | 9/19/2019 | A | FAIL |
Troy Cobbley
|
|
|
Can final when heat is provided and the plastic is attached to the trusses (repaired) and insulation is provided at these patched areas. Phone #: ###-#### Inspection requested via web by Sam Ball
|
INSP-Final | 8/21/2019 | 8/22/2019 | 8/22/2019 | A | PART |
Troy Cobbley
|
|
|
Need the center tenant finished as discussed. Temporary is ok with Boise Fire permission for 30 days as per discussion.
Call prior to going Phone #: 2089148171 >> Inspection requested via mobile web by Brian
|
INSP-Final | 8/20/2019 | 8/21/2019 | 8/21/2019 | A | FAIL |
Troy Cobbley
|
|
|
There were problems with the fire alarm system which prevented testing of the sprinkler system. No testing performed. Phone #: ###-#### Inspection requested via web by Sam Ball
|
INSP-Sprinkler Rough-in | 8/6/2019 | 8/7/2019 | 8/7/2019 | A | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Tenting passed. Piping can be covered. Original entry made under NAF19-00019.
Phone #: ###-#### Inspection requested via web by Sam Ball
|