INSP-Final | 2/5/2020 | 2/6/2020 | 2/7/2020 | P | DONE |
Troy Cobbley
|
|
|
Permit finaled.
Please Contact Rick Fry for an inspection time. Phone #: ###-#### Inspection requested via web by Daniel Buccino
|
DOC - Permit Finaled | | | 2/7/2020 | | DONE |
|
|
|
doc final request per Troy
|
INSP-Sprinkler Rough-in/Hydro | 1/17/2020 | 1/17/2020 | 1/17/2020 | P | PASS |
Troy Cobbley
|
|
|
Overhead hydro witnessed.
This inspection is for an overhead hydro. Please contact Troy Nelson for an inspection time. Phone #: ###-#### Inspection requested via web by Daniel Buccino
|
INSP-Sprinkler Rough-in | 8/27/2019 | 8/27/2019 | 8/27/2019 | P | PART |
Troy Cobbley
|
|
|
The general rough-in is passed. Still need heads under the doors, additional 90's need to be shown as discussed, need the exterior canopies addressed as discussed. Riser not built yet. Please call Roy Nelson for inspection time. Phone #: ###-#### Inspection requested via web by Daniel Buccino
|