INSP-Final | 7/6/2020 | 7/7/2020 | 7/7/2020 | A | DONE |
Troy Cobbley
|
|
|
Permit finaled.
Nate Phone #: ###-#### Inspection requested via web by Nathan Stenquist
|
DOC - Permit Finaled | | | 7/7/2020 | | DONE |
|
|
|
Per Troy
|
INSP-Supply line flush | 11/19/2019 | 11/20/2019 | 11/20/2019 | A | PASS |
Troy Cobbley
|
|
|
U.G. hydro test witnessed with no pressure loss at the guage.
Troy Nelson Phone #: ###-#### Inspection requested via web by Brodie Stenquist
|
INSP-Supply line flush | 11/14/2019 | 11/15/2019 | 11/15/2019 | A | PASS |
Troy Cobbley
|
|
|
The underground supply line flush was witnessed.
troy nelson Phone #: ###-#### Inspection requested via web by Brodie Stenquist
|
INSP-Supply line flush | 11/13/2019 | 11/14/2019 | 11/14/2019 | A | PART |
Troy Cobbley
|
|
|
The remaining underground supply piping is ok for cover. The flush was not ready due to waiting on a thrust block on unrelated piping at the crosss ; flush Troy Nelson Phone #: ###-#### Inspection requested via web by Brodie Stenquist
|
INSP-Supply line flush | 11/12/2019 | 11/13/2019 | 11/13/2019 | P | PASS |
Troy Cobbley
|
|
|
The underground tie-in from the PIV to the building passed. Piping can be covered.
troy nelson Phone #: ###-#### Inspection requested via web by Brodie Stenquist
|
INSP-Supply line flush | 11/11/2019 | 11/12/2019 | 11/12/2019 | A | PASS |
Troy Cobbley
|
|
|
See the city approved plans for section of piping that is ok for cover.
UNDERGROUND COVER TROY NELSON Phone #: ###-#### Inspection requested via web by Brodie Stenquist
|