INSP-Final | 5/29/2020 | 5/29/2020 | 5/29/2020 | P | DONE |
Troy Cobbley
|
|
|
Permit finaled.
Please call Jon with Time frame we will be on site completing esc. after lunch Phone #: ###-#### Inspection requested via web by Jeff Packham
|
DOC - Permit Finaled | | | 5/29/2020 | | DONE |
|
|
|
Per Troy C and the passing final inspection
|
INSP-Sprinkler Rough-in | 2/25/2020 | 2/26/2020 | 2/26/2020 | A | PASS |
Troy Cobbley
|
|
|
Plan mods are acceptable. Piping can be covered.
Please contact Rick Fry for time of inspection. Phone #: ###-#### Inspection requested via web by Daniel Buccino
|
INSP-Sprinkler Rough-in | 2/14/2020 | 2/18/2020 | 2/18/2020 | A | PART |
Troy Cobbley
|
|
|
Piping rough-in passed. But plan mods showing the pipe routing changes/hydraulic calcs will need to be approved prior to an approval for cover.
Please contact Roy Nelson for an inspection time. Phone #: ###-#### Inspection requested via web by Daniel Buccino
|