Groundwork | 8/24/2000 | 8/29/2000 | 8/29/2000 | A | CANC |
Bill VanDegrift
|
|
|
Scheduled by Inspector: 330 On 8/24/2000 just kiddin
|
Groundwork | 8/24/2000 | 8/29/2000 | 8/29/2000 | A | CANC |
Bill VanDegrift
|
|
|
Scheduled by Inspector: 330 On 8/24/2000
|
Final | 3/17/2000 | 3/17/2000 | 3/17/2000 | P | PASS |
Stan Johnson
|
|
|
Scheduled by a contractor via Hello! on 03/17/2000 at 08:55:37. Contact: ###-####.
|
Plumbing Rough-in | 1/4/2000 | 1/5/2000 | 1/5/2000 | A | PASS |
Stan Johnson
|
|
|
ERIN-- ###-#### R/I
|
Plumbing Rough-in | 1/4/2000 | 1/4/2000 | 1/4/2000 | P | CANC |
Stan Johnson
|
|
|
Scheduled by a contractor via Hello! on 01/04/2000 at 07:38:07. Contact: ###-####.--CANCEL PER ARRON WITH MAGIC PLM
|