Final | 5/24/2000 | 5/25/2000 | 5/25/2000 | P | PASS |
Gary Ziegler
|
|
|
and medical gas Sharon ###-####
|
Plumbing Rough-in | 5/17/2000 | 5/18/2000 | 5/18/2000 | A | PART |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 05/17/2000 at 14:59:51. Contact: ###-####.
|
Final | 5/16/2000 | 5/17/2000 | 5/17/2000 | A | NR |
Gary Ziegler
|
|
|
###-####
|
Final | 5/1/2000 | 5/1/2000 | 5/1/2000 | P | PART |
Gary Ziegler
|
|
|
###-####50 psi med gas
5/2/00 1:19:58 PM
|
Med/Gas Systems | 4/27/2000 | 4/28/2000 | 4/28/2000 | A | PART |
Gary Ziegler
|
|
|
150 psi test med gas 4/28/00 9:21:06 AM
|
Plumbing Rough-in | 2/29/2000 | 3/1/2000 | 3/1/2000 | A | PASS |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 02/29/2000 at 13:12:47. Contact: ###-####.
|
Plumbing Rough-in | 1/28/2000 | 1/28/2000 | 1/28/2000 | P | PASS |
Gary Ziegler
|
|
|
###-#### med gas 1/31/00 8:51:46 AM
|
Plumbing Rough-in | 1/25/2000 | 1/26/2000 | 1/26/2000 | A | NR |
Gary Ziegler
|
|
|
###-#### josh
|
Plumbing Rough-in | 1/26/2000 | 1/26/2000 | 1/26/2000 | P | FAIL |
Gary Ziegler
|
|
|
sharon ###-####--call before insp---- talk to rick--2nd floor central-med gas r/i
|
Plumbing Rough-in | 1/18/2000 | 1/18/2000 | 1/18/2000 | P | PART |
Gary Ziegler
|
|
|
###-####---3rd floor south tower--early pm if possible
|
Plumbing Rough-in | 1/10/2000 | 1/10/2000 | 1/10/2000 | P | PART |
Gary Ziegler
|
|
|
###-#### josh ext. Need med. Gas.
|