Final | 2/22/2000 | 2/23/2000 | 2/23/2000 | A | PASS |
Bill VanDegrift
|
|
|
Final ok. 2/24/00 10:39:36 AM
|
Final | 2/10/2000 | 2/11/2000 | 2/11/2000 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 02/10/2000 at 14:57:23. Contact: ###-####. Interceptor UTR's ok, pour concrete prior to final. 2/14/00 12:11:34 PM
|
Groundwork | 2/8/2000 | 2/8/2000 | 2/8/2000 | P | PASS |
Gerry Varner
|
|
|
Scheduled by a contractor via Hello! on 02/08/2000 at 08:59:56. Contact: ###-####. Trench drain ok
|