Final | 5/5/2000 | 5/8/2000 | 5/8/2000 | A | PASS |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 05/05/2000 at 09:33:10. Contact: ###-####.
|
Groundwork | 5/4/2000 | 5/5/2000 | 5/5/2000 | A | FAIL |
Gary Ziegler
|
|
|
###-#### anne
|
Groundwork | 5/3/2000 | 5/4/2000 | 5/4/2000 | A | NR |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 05/03/2000 at 13:15:45. Contact: ###-####.
|
Final | 4/27/2000 | 4/28/2000 | 4/28/2000 | A | PART |
Gary Ziegler
|
|
|
needs pan drain cert device,secure
exspansion tank 4/28/00 12:51:27 PM
|
Water and/or Sewer | 3/1/2000 | 3/1/2000 | 3/1/2000 | P | PASS |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 03/01/2000 at 09:11:09. Contact: ###-####. Waterline 3/2/00 8:46:52 AM
|
Groundwork | 1/28/2000 | 1/31/2000 | 1/31/2000 | A | CANC |
Gary Ziegler
|
|
|
###-####. Rescheduled for later in afternoon-as per Ann from Shilo.
|
Groundwork | 1/31/2000 | 1/31/2000 | 1/31/2000 | P | PASS |
Gary Ziegler
|
|
|
###-####; Ann
|
Plumbing Rough-in | 1/31/2000 | 1/31/2000 | 1/31/2000 | P | PASS |
Gary Ziegler
|
|
|
r\i ok done at the same time the ground work was done
|