Plumbing Rough-in | 6/5/2000 | 6/6/2000 | 6/6/2000 | A | PASS |
Bill VanDegrift
|
|
|
Ann ###-####
|
Roof Drains | 5/4/2000 | 5/5/2000 | 5/5/2000 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 05/04/2000 at 11:53:27. Contact: ###-####.
|
Water and/or Sewer | 5/4/2000 | 5/5/2000 | 5/5/2000 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 05/04/2000 at 11:54:01. Contact: ###-####.
|
Storm Drains | 3/3/2000 | 3/3/2000 | 3/3/2000 | P | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 03/03/2000 at 09:28:01. Contact: ###-####. Bld. #1 complete SD. 3/6/00 11:42:51 AM
|
Plumbing Rough-in | 2/14/2000 | 2/14/2000 | 2/14/2000 | P | PART |
Bill VanDegrift
|
|
|
bldg 1A and 2B ###-#### Sewers and one interceptor ok, one interceptor test failed. 2/15/00 9:29:45 AM
|
Plumbing Rough-in | 2/11/2000 | 2/11/2000 | 2/11/2000 | P | FAIL |
Bill VanDegrift
|
|
|
###-#### No tests on storm drain or sewer. 2/14/00 12:10:22 PM
|
Groundwork | 1/31/2000 | 2/1/2000 | 2/1/2000 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 01/31/2000 at 13:23:41. Contact: ###-####. gw ok 2/3/00 7:48:23 AM
|