Final | 8/2/2000 | 8/3/2000 | 8/3/2000 | A | PASS |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 08/02/2000 at 17:04:51. Contact: ###-####.
|
Final | 4/27/2000 | 4/28/2000 | 4/28/2000 | P | PART |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 04/27/2000 at 14:27:17. Contact: ###-####. Temp final.
|
Plumbing Rough-in | 2/21/2000 | 2/22/2000 | 2/22/2000 | A | PASS |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 02/21/2000 at 13:19:24. Contact: ###-####. Need backflow 2/23/00 11:46:16 AM
|