Final | 4/21/2000 | 4/24/2000 | 4/24/2000 | A | PART |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 04/21/2000 at 11:53:50. Contact: ###-####.
|
Final | 4/24/2000 | 4/24/2000 | 4/24/2000 | P | PASS |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 04/24/2000 at 08:34:51. Contact: ###-####.
|
Final | 4/20/2000 | 4/21/2000 | 4/21/2000 | A | NR |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 04/20/2000 at 11:45:44. Contact: ###-####.needs air certification 4/21/00 9:37:47 AM
|
Med/Gas Systems | 4/20/2000 | 4/20/2000 | 4/20/2000 | P | PART |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 04/20/2000 at 08:09:37. Contact: ###-####.
|
Final | 4/3/2000 | 4/3/2000 | 4/3/2000 | P | FAIL |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 04/03/2000 at 08:40:04. Contact: ###-####.
|
Plumbing Rough-in | 3/6/2000 | 3/7/2000 | 3/7/2000 | A | PART |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 03/06/2000 at 12:23:08. Contact: . Waste only!! 3/8/00 9:58:34 AM
|
Plumbing Rough-in | 3/6/2000 | 3/6/2000 | 3/6/2000 | A | FAIL |
Bill VanDegrift
|
|
|
Conference on corrections to existing system, 2- RP's, intake and exhaust to exterior, repairs to existing waste, liquid/Air separator, resubmit plans with proposed med gas system.
|
Plumbing Rough-in | 3/2/2000 | 3/2/2000 | 3/2/2000 | P | PART |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 03/02/2000 at 09:03:44. Contact: ###-####. Wast only- check med gas.
|