Final | 8/21/2000 | 8/22/2000 | 8/22/2000 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 08/21/2000 at 16:38:24. Contact: ###-####.
|
Final | 5/11/2000 | 5/11/2000 | 5/11/2000 | P | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 05/11/2000 at 07:52:02. Contact: ###-####. seal cabinet at floor sink in breakroom, set equipment in breakroom, provide main shutoff valve by dcva 5/11/00 3:00:36 PM
|
Final | 5/11/2000 | 5/11/2000 | 5/11/2000 | P | PART |
Bill VanDegrift
|
|
|
billy bob seal cabinet at floor sink, set equipment, needs main shutoff valve 5/11/00 3:01:23 PM
|
Plumbing Rough-in | 3/13/2000 | 3/13/2000 | 3/13/2000 | P | PASS |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 03/13/2000 at 09:00:37. Contact: ###-####.
|