Water and/or Sewer | 3/9/2001 | 3/9/2001 | 3/9/2001 | P | FAIL |
Gary Ziegler
|
|
|
Scheduled by Inspector: 334 On 3/9/2001 8:17:40 AM
|
Final | 6/9/2000 | 6/9/2000 | 6/9/2000 | A | PASS |
Stan Johnson
|
|
|
Scheduled by a contractor via Hello! on 06/09/2000 at 07:29:40. Contact: ###-####.
|
Plumbing Rough-in | 3/13/2000 | 3/13/2000 | 3/13/2000 | P | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 03/13/2000 at 08:53:03. Contact: ###-####. R/I ok. 3/14/00 1:54:14 PM
|
Plumbing Rough-in | 3/10/2000 | 3/10/2000 | 3/10/2000 | P | FAIL |
Stan Johnson
|
|
|
Scheduled by a contractor via Hello! on 03/10/2000 at 07:46:40. Contact: ###-####. Raise water lines in garage ceiling, hose piping garage faster to threaded filling an to structure. 3/14/00 11:51:06 AM
|