Final | 11/29/2000 | 11/29/2000 | 11/29/2000 | P | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 11/29/2000 at 09:01:12. Contact: ###-####.
|
Final | 11/16/2000 | 11/17/2000 | 11/17/2000 | A | FAIL |
Bill VanDegrift
|
|
|
Teri ###-#### called debest and told them I wasn't going to final the permit till someone figured out where the smell in the office was originating. 11/17/2000 11:17:59 AM
|
Final | 7/20/2000 | 7/20/2000 | 7/20/2000 | P | PASS |
Bill VanDegrift
|
|
|
###-####\\partial only
|
Final | 7/11/2000 | 7/12/2000 | 7/12/2000 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 07/11/2000 at 16:00:46. Contact: ###-####. still needs a slab poured around containment tank temp occ ok 7/12/00 11:04:37 AM
|
Final | 7/10/2000 | 7/10/2000 | 7/10/2000 | A | FAIL |
Bill VanDegrift
|
|
|
Added by Inspector: 330 On 7/10/00 4833 dorman install hose reels, airgap on t&p drain, airgap fitting on dishwasher drain, test premis protection, complete installation of containment tank on the south side of the building. 7/10/00 9:33:49 AM
|
Plumbing Rough-in | 6/19/2000 | 6/20/2000 | 6/20/2000 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 06/19/2000 at 08:39:46. Contact: ###-####. vents ok 6/20/00 8:53:35 AM
|
Plumbing Rough-in | 6/20/2000 | 6/20/2000 | 6/20/2000 | P | PASS |
Bill VanDegrift
|
|
|
Scheduled by Inspector: 330 On 6/20/00 water system
|
Plumbing Rough-in | 5/24/2000 | 5/25/2000 | 5/25/2000 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 05/24/2000 at 13:25:30. Contact: ###-####. east 2/3rds, and interceptor test ok 5/25/00 9:35:24 AM
|
Water and/or Sewer | 4/14/2000 | 4/17/2000 | 4/17/2000 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 04/14/2000 at 17:12:37. Contact: ###-####.water service 4/17/00
|
Groundwork | 4/7/2000 | 4/10/2000 | 4/10/2000 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 04/07/2000 at 14:40:44. Contact: ###-####. just nees chemical waste to interceptor and interceptor tests 4/10/00
|
Groundwork | 4/6/2000 | 4/7/2000 | 4/7/2000 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 04/06/2000 at 15:31:09. Contact: ###-####. grease line to east end and to was area test ok 4/7/00
|
Groundwork | 4/5/2000 | 4/6/2000 | 4/6/2000 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 04/05/2000 at 14:02:04. Contact: ###-####. interceptor to testroom groups ss and gw mains ok 4/6/00
|