Final | 5/2/2000 | 5/3/2000 | 5/3/2000 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 05/02/2000 at 17:41:31. Contact: ###-####. fial ok with 3 comp. sink secured and calked 5/3/00 11:24:08 AM
|
Final | 5/1/2000 | 5/1/2000 | 5/1/2000 | P | PART |
Bill VanDegrift
|
|
|
late pm ###-#### rp for smoothie mech, pipe water for soda mech from upstream of rp 5/1/00 2:47:54 PM
|
Plumbing Rough-in | 4/4/2000 | 4/4/2000 | 4/4/2000 | P | PASS |
Bill VanDegrift
|
|
|
###-#### ri ok with valve accessable from unit 4/4/00
|
Plumbing Rough-in | 3/16/2000 | 3/17/2000 | 3/17/2000 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 03/16/2000 at 15:37:45. Contact: ###-####. G/W ok with hub drain changed out to F.S. 3/20/00 10:26:33 AM
|