Final | 9/6/2000 | 9/7/2000 | 9/7/2000 | A | PASS |
Bill VanDegrift
|
|
|
5th floor final Frank ###-####
|
Final | 8/3/2000 | 8/3/2000 | 8/3/2000 | P | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 08/03/2000 at 10:23:17. Contact: ###-####.-------- 3rd floor ==fn
|
Final | 7/27/2000 | 7/27/2000 | 7/27/2000 | P | FAIL |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 07/27/2000 at 11:16:56. Contact: . ran into the plumber on the ground floor he said this onspection was for the 3rd floor not the 4th and that he wouldn't be ready today 7/27/2000 3:06:48 PM
|
Final | 4/21/2000 | 4/21/2000 | 4/21/2000 | P | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 04/21/2000 at 08:34:39. Contact: ###-####. 4th floor temp occ ok 4/21/00 3:18:35 PM
|
Water and/or Sewer | 4/3/2000 | 4/4/2000 | 4/4/2000 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 04/03/2000 at 14:40:43. Contact: ###-####.3rd floor ri ok 4/4/00
|
Water and/or Sewer | 3/22/2000 | 3/23/2000 | 3/23/2000 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 03/22/2000 at 15:40:03. Contact: ###-####.4th floor ri only ok, 5th floor needs to be removed from this permit. 3/23/00 9:47:06 AM
|
Water and/or Sewer | 3/21/2000 | 3/22/2000 | 3/22/2000 | A | FAIL |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 03/21/2000 at 15:57:58. Contact: ###-####. this is a rough in , no test, the 5th floor needs to be attached to the building permit for the 5 th floor 3/22/00 10:43:56 AM
|