Final | 4/3/2000 | 4/4/2000 | 4/4/2000 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by Inspector: 330 On 4/3/00
|
Final | 4/3/2000 | 4/3/2000 | 4/3/2000 | P | FAIL |
Bill VanDegrift
|
|
|
###-#### connect sewer in crawlspace 4/3/00
|
Plumbing Rough-in | 3/24/2000 | 3/27/2000 | 3/27/2000 | A | FAIL |
Bill VanDegrift
|
|
|
Virgil Butler ###-####hang pex, wc wetvented on tub, valve for each unit 3/27/00 5:08:27 PM
|
Plumbing Rough-in | 3/24/2000 | 3/27/2000 | 3/27/2000 | A | FAIL |
Bill VanDegrift
|
|
|
Virgil Butler ###-####hang pex, wc wetvented on tub, valve for each unit 3/27/00 5:08:27 PM
|