Final | 6/30/2000 | 6/30/2000 | 6/30/2000 | P | PASS |
Gary Ziegler
|
|
|
###-####
|
Plumbing Rough-in | 4/4/2000 | 4/4/2000 | 4/4/2000 | P | PASS |
Lee Rice
|
|
|
Scheduled by a contractor via Hello! on 04/04/2000 at 08:43:13. Contact: ###-####.
|
Plumbing Rough-in | 3/31/2000 | 4/3/2000 | 4/3/2000 | P | CANC |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 03/31/2000 at 15:33:10. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 04/03/2000 at 08:48:55.
|