Final | 9/1/2000 | 9/1/2000 | 9/1/2000 | P | PASS |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 09/01/2000 at 09:00:43. Contact: ###-####.
|
Plumbing Rough-in | 6/19/2000 | 6/20/2000 | 6/20/2000 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 06/19/2000 at 17:08:49. Contact: ###-####.
|
Groundwork | 4/17/2000 | 4/18/2000 | 4/18/2000 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 04/17/2000 at 15:09:01. Contact: ###-####.
|