Final | 5/19/2000 | 5/22/2000 | 5/22/2000 | A | PASS |
Gerry Varner
|
|
|
Scheduled by a contractor via Hello! on 05/19/2000 at 17:42:04. Contact: ###-####. Final ok 5/24/00 11:06:23 AM
|
Final | 5/11/2000 | 5/12/2000 | 5/12/2000 | A | PASS |
Gerry Varner
|
|
|
Scheduled by a contractor via Hello! on 05/11/2000 at 12:05:04. Contact: ###-####. Gave temp. occ. 5/12/00 2:52:26 PM
|
Plumbing Rough-in | 5/3/2000 | 5/4/2000 | 5/4/2000 | A | PASS |
Gerry Varner
|
|
|
Scheduled by a contractor via Hello! on 05/03/2000 at 16:57:41. Contact: ###-####. R/I ok 5/4/00 4:54:50 PM
|
Groundwork | 4/19/2000 | 4/20/2000 | 4/20/2000 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 04/19/2000 at 15:12:19. Contact: ###-####.
|