Final | 7/6/2000 | 7/7/2000 | 7/7/2000 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 07/06/2000 at 15:09:56. Contact: ###-####.
|
Groundwork | 6/14/2000 | 6/14/2000 | 6/14/2000 | P | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 06/14/2000 at 09:58:39. Contact: ###-####.
|
Final | 5/16/2000 | 5/17/2000 | 5/17/2000 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 05/16/2000 at 14:31:36. Contact: ###-####. east half ok with airgap on t&p drain, temp occ ok 5/17/00 10:29:59 AM
|
Plumbing Rough-in | 5/3/2000 | 5/3/2000 | 5/3/2000 | P | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 05/03/2000 at 09:23:17. Contact: ###-####. did this am 5/3/00 12:12:46 PM
|
Plumbing Rough-in | 5/3/2000 | 5/3/2000 | 5/3/2000 | A | PASS |
Bill VanDegrift
|
|
|
Added by Inspector: 330 On 5/3/00 1081 exchange
|