Final | 12/14/2001 | 12/14/2001 | 12/14/2001 | P | PASS |
Gary Ziegler
|
|
|
Scheduled by Inspector: 334 On 12/14/2001 2:07:41 PM
|
Plumbing Rough-in | 7/30/2001 | 7/31/2001 | 7/31/2001 | A | PASS |
Gary Ziegler
|
|
|
Scheduled by Inspector: 334 On 7/30/2001 4:04:31 PM
|
Plumbing Rough-in | 5/24/2001 | 5/24/2001 | 5/24/2001 | P | PART |
Gary Ziegler
|
|
|
Scheduled by Inspector: 334 On 5/24/2001 10:10:03 AM
|
Water and/or Sewer | 5/22/2001 | 5/23/2001 | 5/23/2001 | A | PASS |
Gary Ziegler
|
|
|
above ground waste and vent ###-####
|
Plumbing Rough-in | 5/21/2001 | 5/21/2001 | 5/21/2001 | P | PART |
Gary Ziegler
|
|
|
above ground waste and vent Pat ###-####
|
Groundwork | 5/18/2001 | 5/18/2001 | 5/18/2001 | P | PASS |
Gary Ziegler
|
|
|
above ground waste and vent Pat ###-####
|
Plumbing Rough-in | 5/15/2001 | 5/15/2001 | 5/15/2001 | A | PART |
Gary Ziegler
|
|
|
PAt ###-####
|
Plumbing Rough-in | 4/12/2001 | 4/12/2001 | 4/12/2001 | P | PART |
Bill VanDegrift
|
|
|
Added by Inspector: 330 On 4/12/2001 2:20:39 PM water system test on 4 restroom groups at the main hall 5th floor ok.
|
Plumbing Rough-in | 3/23/2001 | 3/23/2001 | 3/23/2001 | P | PART |
Gary Ziegler
|
|
|
###-####
|
Plumbing Rough-in | 3/15/2001 | 3/15/2001 | 3/15/2001 | P | PART |
Gary Ziegler
|
|
|
Pat ###-####
|
Plumbing Rough-in | 3/5/2001 | 3/5/2001 | 3/5/2001 | P | PASS |
Gary Ziegler
|
|
|
WATER PIPE ###-####
|
Plumbing Rough-in | 2/16/2001 | 2/16/2001 | 2/16/2001 | P | PASS |
Gary Ziegler
|
|
|
ABOVE GROUND WATER AND VENT\\###-####
|
Plumbing Rough-in | 2/14/2001 | 2/14/2001 | 2/14/2001 | P | PASS |
Gary Ziegler
|
|
|
###-####
|
Plumbing Rough-in | 2/9/2001 | 2/12/2001 | 2/12/2001 | A | PART |
Gary Ziegler
|
|
|
R/I- PAT ###-####
|
Plumbing Rough-in | 2/9/2001 | 2/9/2001 | 2/9/2001 | P | PART |
Gary Ziegler
|
|
|
above ground waste and vent Pat ###-####
|
Plumbing Rough-in | 1/8/2001 | 1/9/2001 | 1/9/2001 | A | PASS |
Gary Ziegler
|
|
|
r/i pat ###-####
|
Plumbing Rough-in | 12/29/2000 | 12/29/2000 | 12/29/2000 | P | PART |
Gary Ziegler
|
|
|
###-#### roof drains 12/29/2000 2:38:29 PM
|
Plumbing Rough-in | 12/27/2000 | 12/28/2000 | 12/28/2000 | A | PART |
Gary Ziegler
|
|
|
###-#### waste and vent
|
Plumbing Rough-in | 12/21/2000 | 12/21/2000 | 12/21/2000 | P | PASS |
Gary Ziegler
|
|
|
###-####
|
Plumbing Rough-in | 12/20/2000 | 12/20/2000 | 12/20/2000 | P | PART |
Gary Ziegler
|
|
|
###-####
|
Plumbing Rough-in | 12/18/2000 | 12/18/2000 | 12/18/2000 | P | PART |
Gary Ziegler
|
|
|
ABOVE GROUND -WASTE & VENT-- PAT ###-####
|
Plumbing Rough-in | 10/27/2000 | 10/30/2000 | 10/30/2000 | A | PART |
Gary Ziegler
|
|
|
a2nd floor restroom waste onlybove ground waste and vent Pat ###-#### 10/30/2000 1:08:07 PM
|
Plumbing Rough-in | 10/19/2000 | 10/20/2000 | 10/20/2000 | A | CANC |
Gary Ziegler
|
|
|
above ground waste and vent Pat ###-####
|
Plumbing Rough-in | 10/19/2000 | 10/20/2000 | 10/20/2000 | A | PART |
Lee Rice
|
|
|
Scheduled by Inspector: 334 On 10/19/2000 pat ###-#### 10/19/2000 7:01:46 PM R/I and test ok from 1st through bottom of 3rd floor for all waste and vents except 2nd floor main bath and all rwl,s to 3rd floor.10/20/2000 11:44:08 AM 10/20/2000 11:44:31 AM
|
Plumbing Rough-in | 9/27/2000 | 9/27/2000 | 9/27/2000 | P | PASS |
Gary Ziegler
|
|
|
u/g waste and vent Pat ###-####
|
Plumbing Rough-in | 8/17/2000 | 8/18/2000 | 8/18/2000 | A | PASS |
Gary Ziegler
|
|
|
underground storm water Pat ###-####
|
Plumbing Rough-in | 8/2/2000 | 8/3/2000 | 8/3/2000 | A | PART |
Gary Ziegler
|
|
|
###-#### above ground waste and vent
|
Plumbing Rough-in | 7/12/2000 | 7/12/2000 | 7/12/2000 | P | PART |
Gary Ziegler
|
|
|
underground waste pat ###-####
|
Plumbing Rough-in | 7/10/2000 | 7/10/2000 | 7/10/2000 | P | PART |
Gary Ziegler
|
|
|
underground waste and vent pat ###-####
|
Plumbing Rough-in | 6/12/2000 | 6/12/2000 | 6/12/2000 | P | PASS |
Gary Ziegler
|
|
|
UNDERGROUND PAT ###-####
|
Plumbing Rough-in | 6/8/2000 | 6/8/2000 | 6/8/2000 | P | PART |
Gary Ziegler
|
|
|
underground ###-####
|
Plumbing Rough-in | 6/6/2000 | 6/7/2000 | 6/7/2000 | A | PART |
Gary Ziegler
|
|
|
underground waste vent ###-####
|
Plumbing Rough-in | 6/1/2000 | 6/2/2000 | 6/2/2000 | A | PART |
Gary Ziegler
|
|
|
underground ###-####
|
Plumbing Rough-in | 6/2/2000 | 6/2/2000 | 6/2/2000 | P | PASS |
Gary Ziegler
|
|
|
underground PAt ###-####
|
Groundwork | 6/1/2000 | 6/1/2000 | 6/1/2000 | P | PART |
Gary Ziegler
|
|
|
underground Pat Walsh ###-####
|
Groundwork | 5/31/2000 | 5/31/2000 | 5/31/2000 | P | PART |
Gary Ziegler
|
|
|
PAT ###-####
|
Groundwork | 5/26/2000 | 5/26/2000 | 5/26/2000 | P | PART |
Gary Ziegler
|
|
|
underground waste water Pat ###-#### ' 5/30/00 7:42:20 AM
|
Groundwork | 5/23/2000 | 5/24/2000 | 5/24/2000 | A | PART |
Gary Ziegler
|
|
|
ground waste and vent Pat Walsh ###-####
|
Plumbing Rough-in | 5/24/2000 | 5/24/2000 | 5/24/2000 | P | PART |
Gary Ziegler
|
|
|
storm water catch basins Pat Walsh ###-####
|
Plumbing Rough-in | 5/17/2000 | 5/17/2000 | 5/17/2000 | P | PART |
Gary Ziegler
|
|
|
###-####
|
Groundwork | 5/11/2000 | 5/12/2000 | 5/12/2000 | A | PART |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 05/11/2000 at 16:25:17. Contact: .
|
Plumbing Rough-in | 5/11/2000 | 5/11/2000 | 5/11/2000 | P | FAIL |
Gary Ziegler
|
|
|
underground waste vent Pat Walsh ###-####
|