Final | 8/30/2002 | 8/30/2002 | 8/30/2002 | P | PASS |
Bill VanDegrift
|
|
|
per bill fn this is for a ri only final ok, meridian set the fixtures and will get a permit 8/30/2002 10:41:24 AM
|
Water and/or Sewer | 10/9/2000 | 10/9/2000 | 10/9/2000 | P | PART |
Bill VanDegrift
|
|
|
larry--###-#### cover up for swr
|
Plumbing Rough-in | 9/25/2000 | 9/26/2000 | 9/26/2000 | P | PASS |
Lee Rice
|
|
|
Scheduled by a contractor via Hello! on 09/25/2000 at 13:34:01. Contact: ###-####.
|
Plumbing Rough-in | 9/26/2000 | 9/26/2000 | 9/26/2000 | P | PASS |
Gary Ziegler
|
|
|
|
Water and/or Sewer | 7/3/2000 | 7/5/2000 | 7/5/2000 | A | PART |
Bill VanDegrift
|
|
|
###-#### water service to new garage 7/5/00 10:40:43 AM
|