Final | 3/5/2001 | 3/6/2001 | 3/6/2001 | A | PASS |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 03/05/2001 at 16:05:11. Contact: ###-####.
|
Final | 3/2/2001 | 3/2/2001 | 3/2/2001 | P | FAIL |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 03/02/2001 at 11:25:54. Contact: ###-####.
|
Final | 3/2/2001 | 3/2/2001 | 3/2/2001 | P | FAIL |
Jim Johnson
|
|
|
Scheduled by Inspector: 360 On 3/2/2001 4:55:41 PM need to tie re-cir. line in up stream of shut off valve for water heater. 3/2/2001 4:58:01 PM
|
Plumbing Rough-in | 10/11/2000 | 10/12/2000 | 10/12/2000 | A | PASS |
Lee Rice
|
|
|
88-7555
|
Groundwork | 7/18/2000 | 7/19/2000 | 7/19/2000 | A | PASS |
Gary Ziegler
|
|
|
renee---###-#### ground
|