Final | 8/14/2001 | 8/14/2001 | 8/14/2001 | P | PASS |
Gary Ziegler
|
|
|
Scheduled by Inspector: 334 On 8/14/2001 9:45:51 AM
|
Final | 8/8/2001 | 8/9/2001 | 8/9/2001 | A | NR |
Gary Ziegler
|
|
|
Renee ###-####
|
Plumbing Rough-in | 10/27/2000 | 10/27/2000 | 10/27/2000 | P | PASS |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 10/27/2000 at 08:27:45. Contact: ###-####.
|
Groundwork | 7/21/2000 | 7/21/2000 | 7/21/2000 | P | PASS |
Gary Ziegler
|
|
|
###-####--renee ground work insp
|