Final | 8/17/2000 | 8/18/2000 | 8/18/2000 | P | PASS |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 08/17/2000 at 12:05:22. Contact: ###-####.
|
Plumbing Rough-in | 8/9/2000 | 8/10/2000 | 8/10/2000 | A | PASS |
Gary Ziegler
|
|
|
eric ###-####
|
Plumbing Rough-in | 8/2/2000 | 8/3/2000 | 8/3/2000 | A | PART |
Gary Ziegler
|
|
|
###-#### sprinkler T added
|
Water and/or Sewer | 7/31/2000 | 7/31/2000 | 7/31/2000 | P | PASS |
Gary Ziegler
|
|
|
###-####
|