Final | 3/22/2001 | 3/22/2001 | 3/22/2001 | P | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 03/22/2001 at 11:08:49. Contact: ###-####.
|
Final | 3/21/2001 | 3/21/2001 | 3/21/2001 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 03/21/2001 at 09:48:10. Contact: ###-####. expansion tank to small need to be st-12 toilet and ped. lav needs to be sealed at floor in powder room. 3/21/2001 1:59:10 PM
|
Plumbing Rough-in | 7/26/2000 | 7/26/2000 | 7/26/2000 | P | PASS |
Gary Ziegler
|
|
|
###-####--jeff r/i
|