Final | 8/31/2000 | 8/31/2000 | 8/31/2000 | P | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 08/31/2000 at 10:24:42. Contact: ###-####.
|
Final | 8/28/2000 | 8/29/2000 | 8/29/2000 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 08/28/2000 at 15:06:35. Contact: ###-####. fd vent in electrical room wall still not tied in on eit 8/29/2000 9:11:52 AM er end 8/29/2000 9:11:56 AM temp occ ok 8/29/2000 9:14:14 AM
|
Groundwork | 8/8/2000 | 8/9/2000 | 8/9/2000 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 08/08/2000 at 13:46:46. Contact: ###-####. g ok with a ss 1/4 bend at horizontal to vertical offset 8/9/2000 9:12:05 AM
|
Plumbing Rough-in | 8/8/2000 | 8/9/2000 | 8/9/2000 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 08/08/2000 at 13:47:10. Contact: ###-####. still needs fd vent tied in 8/9/2000 9:12:25 AM
|