Final | 10/18/2000 | 10/18/2000 | 10/18/2000 | P | FAIL |
Lee Rice
|
|
|
Doug ###-####gave to bill 10/18/2000 3:42:53 PM
|
Final | 10/19/2000 | 10/18/2000 | 10/18/2000 | P | PASS |
Bill VanDegrift
|
|
|
Added by Inspector: 330 On 10/19/2000
|
Final | 10/19/2000 | 10/18/2000 | 10/18/2000 | P | PASS |
Bill VanDegrift
|
|
|
Added by Inspector: 330 On 10/19/2000
|
Plumbing Rough-in | 8/16/2000 | 8/17/2000 | 8/17/2000 | A | FAIL |
Gary Ziegler
|
|
|
Doug ###-####
|
Plumbing Rough-in | 8/15/2000 | 8/16/2000 | 8/16/2000 | A | FAIL |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 08/15/2000 at 10:22:48. Contact: .
|