Final | 9/5/2001 | 9/6/2001 | 9/6/2001 | A | NR |
Gary Ziegler
|
|
|
fn martin ###-####
|
Final | 9/6/2001 | 9/6/2001 | 9/6/2001 | P | PASS |
Gary Ziegler
|
|
|
Scheduled by Inspector: 334 On 9/6/2001 9:34:44 AM
|
Final | 8/24/2001 | 8/27/2001 | 8/27/2001 | A | NR |
Gary Ziegler
|
|
|
martin ###-#### re-insp fn
|
Final | 5/14/2001 | 5/15/2001 | 5/15/2001 | P | FAIL |
Gary Ziegler
|
|
|
fn martin ###-#### fn mart###-####pipe relief line ,caulk fixtures 5/15/2001 3:32:32 PM
|
Plumbing Rough-in | 8/28/2000 | 8/29/2000 | 8/29/2000 | A | PASS |
Gary Ziegler
|
|
|
reinspection ###-#### martin
|
Plumbing Rough-in | 8/23/2000 | 8/25/2000 | 8/25/2000 | A | FAIL |
Gary Ziegler
|
|
|
MARTIN ###-#### R/I
|
Plumbing Rough-in | 8/22/2000 | 8/24/2000 | 8/23/2000 | A | CANC |
Gary Ziegler
|
|
|
Martin ###-####--CHANGED DATE
|