Final | 9/26/2000 | 9/27/2000 | 9/27/2000 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 09/26/2000 at 14:26:07. Contact: ###-####. panda final ok 9/27/2000 1:57:15 PM
|
Final | 9/25/2000 | 9/25/2000 | 9/25/2000 | P | PART |
Lee Rice
|
|
|
Scheduled by a contractor via Hello! on 09/25/2000 at 09:58:20. Contact: ###-####.need water line and rp to soap disp.
|
Final | 9/20/2000 | 9/20/2000 | 9/20/2000 | P | FAIL |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 09/20/2000 at 07:32:18. Contact: ###-####. 9/20/2000 3:05:32 PM secure indirect waste piping under ice mechine, pipe ice bin drain, secure 3 comp. sink, calk all fixtures, soda mechine r.p. is too high lower and pipe drip cup to drain, test backflow preventors, set all equipment, dwv fittings required on all indirect waste piping. 9/20/2000 3:07:55 PM
|
Water and/or Sewer | 8/22/2000 | 8/23/2000 | 8/23/2000 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 08/22/2000 at 14:39:21. Contact: ###-####. lee did yesterday 8/23/2000 1:19:54 PM
|
Water and/or Sewer | 8/22/2000 | 8/22/2000 | 8/22/2000 | P | PASS |
Lee Rice
|
|
|
|
Water and/or Sewer | 8/22/2000 | 8/22/2000 | 8/22/2000 | P | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 08/22/2000 at 10:01:42. Contact: ###-####.
|
Plumbing Rough-in | 8/9/2000 | 8/9/2000 | 8/9/2000 | P | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 08/09/2000 at 10:52:33. Contact: ###-####. gw ok 8/9/2000 4:57:51 PM
|