Final | 2/20/2001 | 2/21/2001 | 2/21/2001 | P | PASS |
Bill VanDegrift
|
|
|
###-#### final ok with dw hose wired up to counter top height 2/20/2001 3:07:55 PM
|
Plumbing Rough-in | 9/25/2000 | 9/26/2000 | 9/26/2000 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 09/25/2000 at 13:48:22. Contact: ###-####.
|
Plumbing Rough-in | 9/20/2000 | 9/21/2000 | 9/21/2000 | P | FAIL |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 09/20/2000 at 16:39:32. Contact: ###-####. no access 9/22/2000 7:43:13 AM
|
Plumbing Rough-in | 9/14/2000 | 9/15/2000 | 9/15/2000 | A | FAIL |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 09/14/2000 at 14:04:44. Contact: ###-####. remove 2" bushed coupling in lav waste, leak in 2" waste in crawlspace 9/15/2000 10:51:20 AM waterheater t&p drain is trapped 9/15/2000 11:00:48 AM
|
Plumbing Rough-in | 9/12/2000 | 9/14/2000 | 9/13/2000 | A | CANC |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 09/12/2000 at 10:11:06. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 09/13/2000 at 12:31:47.
|