Final | 10/30/2000 | 10/30/2000 | 10/30/2000 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 10/30/2000 at 07:27:42. Contact: ###-####.
|
Plumbing Rough-in | 8/17/2000 | 8/17/2000 | 8/17/2000 | P | FAIL |
Bill VanDegrift
|
|
|
Added by Inspector: 330 On 8/17/2000 tub waste stillbackgraded
|
Plumbing Rough-in | 8/17/2000 | 8/17/2000 | 8/17/2000 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by Inspector: 330 On 8/17/2000 stargazer
|
Plumbing Rough-in | 8/15/2000 | 8/15/2000 | 8/15/2000 | P | FAIL |
Bill VanDegrift
|
|
|
ROB-- ###-#### CELL R/I master tub waste still backgraded 8/15/2000 5:02:41 PM
|
Plumbing Rough-in | 8/14/2000 | 8/14/2000 | 8/14/2000 | P | FAIL |
Bill VanDegrift
|
|
|
ROB-- ###-#### R/I pex within 12" of recessed light, 2" master tub waste backgraded, nailplates required at main water shutoff, no test on 2nd floor waste and vent system, guage on water system test defective, replace and retest 8/14/2000 3:10:55 PM
|