Final | 9/1/2000 | 9/5/2000 | 9/5/2000 | A | PASS |
Gerry Varner
|
|
|
###-#### final ok 9/5/2000 1:09:04 PM
|
Plumbing Rough-in | 8/22/2000 | 8/22/2000 | 8/22/2000 | P | PASS |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 08/22/2000 at 09:45:12. Contact: ###-####.
|
Water and/or Sewer | 8/15/2000 | 8/15/2000 | 8/15/2000 | P | PASS |
Gary Ziegler
|
|
|
after 4pm Overall Plm ###-####
|